System Temperatures

Friday, October 30, 2009

The Garn's Final resting place!


After a week of curing, it was time to place the unit. We had to place foam insulation on the floor of the shed to minimize heat loss, and then it was moving time.


Fortunately, our tractor could move the unit pretty easily, so we rigged a weight spreading bar to support the GARN, and we proceeded to work.

There were no real gotchas, everything went smoothly. Now framing the Garn Barn and the underground trench can proceed. We want to wait until the roof is up to insulate the GARN so we can minimize any rain damage. The trench could not be completed until we were able to drive over that area to place the GARN.